Subject of the contract: Execution of disassembly and assembly works for the task “TE Installation of diagonal pump 50D22 at PZ and PE HMG pumping station”.

Task scope:

Carry out disassembly and installation work of a multi-discipline nature, including:

  • Installation of power and control of the pumping unit with integration into the HMG Superior Control System.
  • Preparation of the stand for the installation of the diagonal pump
  • Integration and installation of Powen diagonal pump – Wafa Pomp, Q=2300m3/h.
  • Installation of steel discharge pipeline DN500

Implementation date: September 2019 – July 2020

Investor: KGHM Polska Miedź S.A – Głogów smelter

General Contractor: SPS INSCON Sp. z o.o.