Signing a contract with Mercus Logistyka sp. z o.o.

27 October 2020
2 minutes of reading

Subject matter: Modernization of the M-040 Central Warehouse on the basis of Mercus Logistyka sp. z o.o. in Polkowice, ul. Mine 11- water supply connection

Task scope:

1. perform dismantling work of asphalt pavement
2. execution of installation works:
– Installation of a water supply connection made of PE100 SDR17 110×6.6 pipes with a length of 25m along with connection to the existing water supply network made of PE100 SDR17 110×6.6 pipes.
– Introduction of the water supply connection to the M-040 Central Warehouse building and connection to the DN100 internal hydrant system
– Construction of PE/steel transition within the M-040 building and installation of DN100 flanged gate valve and DN100 anti-contamination check valve
– Implementation of thermal insulation of the PE pipeline with mineral wool lagging with a thickness of. 150 mm and housing made of galvanized steel sheet
3. installation of the flow priority system: pressure sensor for monitoring the pressure drop in the hydrant system and the solenoid valve, together with the necessary electrical and instrumentation installation
4. perform tests and measurements in accordance with the requirements included in the technical specifications for the execution and acceptance of works and in accordance with the requirements of the applicable regulations and standards
5. perform flushing and disinfection of pipelines
6. restoration of ground and paved surfaces along the route of the connection to the state before the start of the works, marking the route of the pipeline


Implementation date: May 2021 – July 2021
Investor: Mercus Logistyka sp. z o.o.
General Contractor: SPS INSCON Sp. z o.o.