Subject of the contract: implementation of the investment task of performing construction works in the implementation of the task entitled. Expansion of production hall with reconstruction of MV connection.
The scope of work includes, among other things:
- Earthworks, footings, footings, foundations, foundations with thermal insulation;
- Hall structure (steel) including wall cladding, crane beams, roof;
- industrial flooring;
- Window and door woodwork, gates;
- installations – including. Heating, ventilation, roof drainage, electrical;
- Connection of process heat and roof drainage systems to existing systems in hall C1;
- Supply and installation of overhead cranes;
- Execution of technical designs for architectural, sanitary construction, electrical, telecommunication engineering;
- Implementation of overhead crane drives with a capacity of 2t in the degree of protection IP55;
- Prefabrication and corrosion protection of 2 pcs. absorbers with bases;
- Reinforcement of the floor at the site of the planned process line.
Completion date: June 2024 – December 2024
Contracting Authority: Systems and Technologies Sp. z o.o.
General Contractor: SPS INSCON Sp. z o.o.