Signing a contract with KGHM Polska Miedź S.A. Głogów Copper Smelter Division

07 June 2021
1 minutes of reading

Subject of the contract: Stop HMG II 2022 Repair of piping and fittings of the 40D30 pumping station of the Lower Circuit.

Scope of investment:

– Construction and installation industry for the restoration and installation of replaced fittings and piping of four 40D30 diagonal pumps, manifold system and connection to the existing outlet system at the pumping station
– Disassembly of the existing installation of the downstream pumping station, which consisted of manifolds DN500, DN350, along with fittings
– Installation of a new installation of DN600, DN500 and DN400 steel pipelines, including the installation of DN400, DN600 butterfly valves, DN400 check valves and DN400 expansion joints
– Carry out tests, tests and measurements in accordance with the requirements included in the technical designs and in accordance with the requirements of the applicable regulations and standards and the guidelines of the manufacturers of the installed parts and components


Implementation date: April 2022-July 2022
Investor: KGHM Polska Miedź S.A – Głogów smelter