Author name: admin

Signing an agreement with SPS Budownictwo sp. z o.o.

Subject of the contract: Construction of a Plant for the production of lime and dolomite granules with additives. Subject matter: – Prefabrication, delivery and installation of steel structures including corrosion protection, workshop documentation, fasteners, platform gratings, stair treads, anchors, brands, fittings, railings, platform covering, etc;– Prefabrication and supply of hoppers, buffer tank, silos;– execution of […]

Signing an agreement with SPS Budownictwo sp. z o.o. Read More »

Signing an agreement with ENERGETYKA sp. z o.o.

Subject of the contract: “ENE-E3-PN-1040-2022-CENTRAL CONTROLLING STATION Installation of Central Control Room at EC3 Department”. The scope of the task: selection with adaptation of the master control system of the main equipment of the EC-3 Department, together with the necessary infrastructure and renovation of the rooms under the new wheelhouse at the EC-3 Department Glogow,

Signing an agreement with ENERGETYKA sp. z o.o. Read More »

Signing of an agreement with KGHM Polska Miedź S.A. Ore Enrichment Plants Branch

Subject of the contract: Replacement of air turbocompressors as part of the task “Replacement of the installation of technological air in the ZWR Lubin District”. The subject of the Agreement is the replacement of the existing turbocompressors with modern, high-efficiency equipment, along with the replacement of the suction and discharge systems within the building. Task

Signing of an agreement with KGHM Polska Miedź S.A. Ore Enrichment Plants Branch Read More »

Signing of a contract with Przedsiębiorstwo Techniki Cieplnej “PIECOSERWIS”

Subject matter: Construction of steel structures for the heating chambers, as well as fabrication and installation of the gas, combustion air and cooling air systems as part of the task entitled. “Replacement of furnaces and exhaust extraction system of rotary dryers S1 and S2 in ZWR Rudna District”. Task scope:– Making 2 kpl. steel structure

Signing of a contract with Przedsiębiorstwo Techniki Cieplnej “PIECOSERWIS” Read More »

Signing an agreement with Energetyka sp. z o.o.

Subject of the contract: “ENE-E3-PN-586-2022 – Renovation of the pipeline of the DHW heat substation at the EC3 Głogów Department”. Task scope: 1. technical review of the CH/CWU heat substation at the EC-3 Glogow Department with the preparation of a report.2 Disassembly work:– Removal of the existing cold water pipeline with insulation and existing fittings

Signing an agreement with Energetyka sp. z o.o. Read More »

Signing of an agreement with KGHM Polska Miedź S.A. Polkowice Ore Enrichment Plant Branch

Subject of the contract: Replacement of furnaces and exhaust extraction systems of rotary dryers S1 and S2 in the area of ZWR Rudna Task scope: – Perform dismantling and demolition of existing combustion chambers– Construction of foundations and support structures for the furnace chamber and service platforms– Delivery, installation and commissioning of the heating chamber

Signing of an agreement with KGHM Polska Miedź S.A. Polkowice Ore Enrichment Plant Branch Read More »

KGHM Polska Miedź S.A. Polkowice-Sieroszowice Mine Branch

Subject of the contract: Construction works – preparation of the facilities of the Surface Fan Station at shaft SG-2 for the overhaul of four GAF fans. Task scope: 1. dismantling and reinstallation of the reinforced concrete slabs of the GAF fan transport hatch roof, along with the comprehensive replacement of the felt roof covering Implementation

KGHM Polska Miedź S.A. Polkowice-Sieroszowice Mine Branch Read More »

Signing a contract with KGHM Polska Miedź S.A. Głogów Copper Smelter Division

Subject of the contract: “P-6 – Installation of a shed – on the sodium-water glass dosing pump system for the acid circuits of the Skruber RFS and Cooling Tower – to protect it from the weather.” Task scope: 1. execution of assembly works in the field of structural and mechanical branch:– assembly of steel structure

Signing a contract with KGHM Polska Miedź S.A. Głogów Copper Smelter Division Read More »

Signing a contract with ZUW URBEX sp. z o.o.

Subject matter: Comprehensive prefabrication, supply and installation of steel structures of the roof, canopies and pillars within the framework of the investment task entitled. “Construction of a business incubator in the Wroclaw Park in Lubin”. Task scope: – Prefabrication, delivery and installation of roof steel structure– Prefabrication of steel structure– Workshop project– Purchase of metallurgical

Signing a contract with ZUW URBEX sp. z o.o. Read More »

Scroll to Top