Installation of central heating and central heating and ventilation and air conditioning systems for ALFRED TALKE GmbH & Co. KG

21 August 2023
1 minutes of reading

Completion of the investment – Installation of CO and C.T. systems, as well as ventilation and air conditioning in buildings B1, B2, B3 and B4 in the Police Polymers complex.

Task scope:
Comprehensive HVAC installation on B1, B2, B3, B4 buildings including:

  • Ventilation and air conditioning installation for Administration Building (Bldg. 01), Packaging Hall (Bldg. 02), Guard house (Bldg. 04);
  • process heat and central heating systems for the Administration Building (Bldg. 01), Packaging Hall (Bldg. 02), Storage Silo (Bldg. 03) facilities
  • installation of hot, cold and circulating water, being a transit installation between building B1 and B2 with equipping the Heat Exchanger Room in building B2 with a water treatment system
  • supply and installation of a 1000KW heat substation with heating function in winter and summer, integrated condensate pumping station
Scroll to Top