Signing of an agreement with the Polkowice District Headquarters of the State Fire Service

03 October 2023
1 minutes of reading

Subject of the contract: Construction of a garage building with a workshop and storage room of the District Headquarters of the State Fire Service in Polkowice – STAGE II.

The scope of work included the execution of:

  • building structure made of HEB 240 steel profiles and cold-formed purlins “Z” 100x49x1.5mm’
  • Substructures for window and door openings and gates from 120x120x4mm closed profiles;
  • Wall sheathing made of metal-clad sandwich panels with a core of polyisocyanurate PIR foam 12cm thick, and roof sheathing made of sandwich panels 16cm thick;
  • Drainage of water from the roof into gutters and downpipes;
  • supply and installation of window joinery from PVC profiles, steel shell doors, industrial gates with automatic drive with dimensions. 4×4 m and 3×3 m.

Implementation date: October 2023 – December 2023
Ordering party: District Headquarters of the State Fire Service in Polkowice
General Contractor: SPS INSCON Sp. z o.o.

Scroll to Top