Signing an agreement with Energetyka sp. z o.o.
Subject of the contract: “ENE-E3-PN-586-2022 – Renovation of the pipeline of the DHW heat substation at the EC3 Głogów Department”.
Task scope:
1. technical review of the CH/CWU heat substation at the EC-3 Glogow Department with the preparation of a report.
2 Disassembly work:
– Removal of the existing cold water pipeline with insulation and existing fittings in the heat distribution hall, corridor, SUR locker room.
3. installation work:
– installation of a new cold water pipeline PE Ø75mm with the installation of fittings
– installation of supports and slings
– replacement of three-way control valve DN50 with actuator
– replacement of technical thermometers.
4. calibration of ultrasonic heat meters.
5. Chemical cleaning of two 1500l DHW tanks – removal of carbonate deposits and corrosion products.
Implementation date: August 2022 – December 2022
Ordering party: Energetyka sp. z o.o.
General Contractor: SPS INSCON Sp. z o.o.